Risk Assessments.

Risk assessments are carried out for all contracts. Our approach is to identify a task with a hazard, determine the risk, implement the control procedure and determine the residual risk. Below are a number of examples using this methodology:

TASK

HAZARDS

RISK BEFORE CONTROL MEASURE RESIDUAL RISK

Materials being moved by forklift

Fall of materials or lifting equipment and accessories onto persons and property

High

Only trained and competent drivers to use the forklift, machine to be regularly maintained tested and examined as well as any accessories used.

Low

Moving vehicles

Crushing, collision, reversing over persons, falling into excavations

High

Trained Banksmen used, high visibility vest to be worn at all times while outside pedestrian routes. Site traffic plan to be observed and complied with by all operatives

Low

Use of mixer

Entanglement

Med

All operatives will receive a familiarisation with the equipment by the Foreman prior to use

Low

DTS Construction Ltd - Watercress Beds - Springwell Lane - Rickmansworth - Hertfordshire - WD3 8UX
Tel: 01923 896959 - Fax: 01923 897060 - E-mail: mail@dtsconstruction.co.uk
Brickwork - Blockwork - Stonework - Construction - Bricklayers - Builders - New Brickwork Contractors - Architecural Brickwork
Berkshire - Buckinghamshire - London - Essex - Cambridgeshire - Bedfordshire - Southeast - Thames Valley
Harrow - Beaconsfield - High Wtcombe - Watford - Chesham - Hillingdon - Slough - Potters Bar - Saint Albans - Barnet